Prefabricated Cabin-type Substation
![](http://deswchina.com/en/images/icon/line.png)
Based on the idea of prefabrication and the concept of "standardized design, factory prefabrication and integrated construction", the mode of a substation from "construction" to "purchase" is realized. The mode can be applied to the construction of grid substations, new energy power generation step-up substations, industrial substations, urban distribution network substations and other scenarios. With the goal of timesaving, small occupied land, worry-saving and economy, XJ provides users with "one-stop" services from design and equipment to construction.
Relevant Case
![](http://deswchina.com/en/images/icon/line.png)
![](http://deswchina.com/en/resources/image/2024/07/12/567782762700869.jpg)
Automatic Intelligent Production Line of Prefabricated Cabin
![](http://deswchina.com/en/resources/image/2024/07/13/568218004807749.png)
Addis Ababa Prefabricated Cabin, Ethiopia
![](http://deswchina.com/en/resources/image/2024/07/12/567782554284101.jpg)
Zhongshan Tongfu 110kV Prefabricated Cabin Substation of China Southern Power Grid
![](http://deswchina.com/en/resources/image/2024/07/12/567782451462213.jpg)
110kV Step-up Substation for 40MW Wind Farm Project of China Resources in Huangchi Town, Fengqiu County